Cycle Timeline |
|
|
|
|
|
|
Cycle Time displays a graphical and tabular picture of the shovel loading activity based on 1 hour segments. Information displayed includes:
- Cycle Count for that hour.
- Loaded Tons for that hour.
The data may also be exported into EXCEL, or the graph printed.
(top of page)
|
|
|
|
Utilization Report |
|
|
|
|
|
|
|
Utilization shows a graphical and tabular summary of the shovel’s operation. The categories are the same as are generated in Chronology.
- Bus Off is the time that the DC Bus was not energized
- Propel is when the machine was in Propel Mode with the brakes released
- Idle is when the bus is on, but no brakes are released
- NL Dig is when the bus is on, machine in dig, one or more motion brakes released, but no trucks are being loaded
- Dig is truck loading operations.
The chart may be printed and the data may exported.
(Top of Page)
|
|
|
|
Dipper Trip Analysis |
|
|
|
|
|
|
|
One of the biggest maintenance items on a shovel is the dipper trip mechanism. But how can you know how much time is really being lost and therefore when to schedule maintenance?
The MIDAS solution is to monitor the time time between dipper trips. In short, if the time between operations is too small, then the dipper door probably didn’t open the first time. Also included in the report is the tons in the dipper at that time. This helps distinguish if malfunctions are a result of load, or whether the dipper trip was operated inadvertently. The data can be exported to EXCEL
(Top of Page)
|
|
|
|
Limit Analysis |
|
|
|
|
|
|
Limit Analysis provides tabular information on Crowd and Hoist Limit Operation. i.e. how many time those limits were activated during machine operation. Additionally, information on Boom Jacks is included. Together, this information provides an indication of how badly the shovel is being abused, or how much care the operator is showing. Information is provided as to the time of day, type of limit, and hoist/crowd positions.
(Top of Page)
|
|
|
|
Truck Timeline |
|
|
|
|
|
|
|
The Truck Timeline shows an hour by hour accounting of how many trucks were loaded and the total tonnage loaded for that hour. The display is in both graphical and tabular form. The graph may be printed and the table exported to EXCEL for further processing.
(Top of Page)
|
|
|
|
Swing Angle Distribution |
|
|
|
|
|
|
|
Swing Angle Distribution is a clear indicator of pit performance. The report shows in graphical and tabular form the number of occurrences of various swing angles measures as seen during truck load cycles. The chart may be printed and the table exported to EXCEL for further processing.
(Top of Page)
|
|
|
|
Cycle Time - Ton Distribution |
|
|
|
|
|
|
|
This report shows how many tons were loaded from which shovel dig cycle times. The data is reported in graphical and tabular form. The chart may be printed.
(Top of Page)
|
|
|
Average Tons per Cycle Time |
|